$1,500 to Re-Sheet This Ceiling: Is the Contractor Overcharging?

The easiest way to determine whether you’re being overcharged isn’t to argue with the contractor—it’s to get comparable quotes.

Ask two or three drywall contractors to quote the exact same scope of work.

Tell each contractor:

“I need this ceiling re-sheeted, finished and ready for paint. Please include materials, labor, taping, mudding, sanding, cleanup and disposal in the quote.”

Then compare the estimates.

If three contractors come back around $1,300–$1,700, the $1,500 quote is probably within the normal range for your area.

If everyone else is around $700–$900, then you have a good reason to question the original quote.

Bottom Line

Looking at the photo, $1,500 isn’t automatically an outrageous price.

The ceiling requires more than simply putting boards over the exposed wood. The contractor may be charging for preparation, overhead installation, finishing, multiple visits, cleanup and the difficulty of working around the existing structure and wiring.

At the same time, a homeowner shouldn’t accept a $1,500 quote without knowing exactly what is included.

Get the quote in writing, determine the ceiling’s square footage, ask for the scope of work, and compare at least two other contractors.

The drywall itself may be the cheapest part of the project. The labor and finishing are where the money usually goes.

Leave a Reply

Your email address will not be published. Required fields are marked *